BRILPARKINDUSTRIAL PARK

Investor brief · 08 Aug 2026

BRIL PARK: a manufacturing launch site in Vinnytsia region, Ukraine

A former sugar-factory brownfield combining development land, existing buildings, on-site rail and disclosed utility screening data. Initiator: ERAGON JSC.

27.93 haindustrial land
6,000 m²available buildings
29.6699 hafiltration fields outside the park
1.3 MWcurrently available
1,800 m³/havailable gas
up to 32 wagonson-site rail

Investment thesis

  • Choice between a greenfield configuration and adaptation of existing assets
  • No preset minimum plot size
  • One route for technical screening and commercial configuration

Cooperation models

  • Land lease
  • Lease of existing buildings
  • Joint venture
  • Investment partnership

Required validation

  • Technical conditions for actual loads
  • Building and structural suitability
  • Permitting and environmental requirements
  • Eligibility for tax and customs incentives
  • Commercial terms and launch roadmap