Relocated manufacturers
Move or expand production using existing buildings and utility connections.
Describe your needs↗Ukrainian law provides eligible industrial park participants with a corporate income tax exemption for up to 10 years subject to reinvestment, import-duty and import-VAT relief for qualifying new production equipment, and potential local land and property tax incentives.
The park team coordinates one route from enquiry to site configuration: process, logistics, utility loads, launch timing and partnership structure.
Move or expand production using existing buildings and utility connections.
Describe your needs↗Greenfield and brownfield formats, public incentives and support for entering an industrial project in Ukraine.
Discuss an investment↗Joint production, technology localisation and partnerships in agro-processing, energy and materials.
Propose a partnership↗Existing buildings, utilities and on-site rail mean less infrastructure has to be built from scratch, helping manufacturers start sooner and direct more capital into their own equipment and process. The filtration fields are outside the industrial park but can be used by residents as separate wastewater infrastructure.
27.93 ha with no preset minimum plot size — configuration is defined by each project's requirements.
6,000 m² currently available for production, warehousing, administration and auxiliary functions.
Warehouse and manufacturing space for lease↗A separate 29.6699 ha area outside the park, available to residents for integration into the wastewater system.
Explore the filtration fields↗
Separate engineering infrastructure
Outside the park is a formed 29.6699 ha wastewater site with 22 embanked cells. It is connected to the industrial area by a 1,529 m steel pipeline and may be integrated into a resident-specific solution after survey, wastewater analysis, design and permitting.
Final connection parameters are confirmed through technical conditions for each resident's specific load.
Electricity
up to 1.3 MWavailable under technical conditions · initiator data: 2.9 MW substation · provisional potential for up to 9 MW moreNatural gas
1,800 m³/havailable volume · high- and low-pressure pipelinesProcess water
up to 3,600 m³/daycalculated intake from the Riv River under defined water-management conditionsPotable water
up to 120 m³/daycentralised artesian water sourceRail
up to 32 wagonsrailway spur directly into the parkWastewater
29.6699 haseparate filtration fields outside the park, available for resident useiFigures are screening inputs. The final connection scheme and cost are determined after reviewing the questionnaire, process technology and technical conditions.
The park is in Brailiv, within the Zhmerynka urban territorial community of Vinnytsia region, with access to the Zhmerinka railway hub, the M21 / E583 international road and a strong agricultural raw-material base.
Open location on map↗Supports inbound raw materials and outbound finished goods directly from the park.
Access to an international transport corridor through the regional road network.
Vinnytsia region provides a strong feedstock base for food and deep processing.
Brailiv, Zhmerinka, Vinnytsia and surrounding communities form the recruitment area.
BRIL PARK is being developed around circular-economy principles: by-products and waste from one manufacturer should become a resource or feedstock for another. This synergy potential will be considered when reviewing prospective resident applications.
Resource links between residents are structured after feasibility work and mutual agreement.
Partnership models
Locate your own production, adapt existing assets or structure a joint investment project.
A plot configured around the process layout and required sanitary protection zone.
Suitability review, adaptation plan and approval of utility loads.
Allocation of roles, capital, assets and operating responsibility between partners.
A strategic, financial or technology partner for a defined industrial project.
Other cooperation formats are structured individually by mutual agreement.
Public incentives
Incentives are not automatic. Eligibility depends on participant status, activity codes, asset type, timing, use of funds and other statutory requirements. Separate tax and customs due diligence is required before an investment decision.
Official Ministry of Economy materials↗News and experience
Official park milestones and accessible examples of how European industrial parks create jobs, renew sites and connect manufacturers.
All articles→On 25 August 2026, Ukraine's Ministry of Economy and Environment confirmed that information on BUD AGRO PLUS obtaining participant status at BRIL PARK had been entered in the Industrial Parks Register.
Read↗BRIL PARK in Brailiv offers 6,000 m² of existing buildings for warehousing or manufacturing, rail and utility infrastructure, and a route to expand power supply for a defined project load.
Read↗France’s PIPA shows that an industrial park is more than fenced land: it combines jobs, shared services, environmental rules and long-term management.
Read↗Key facts
27.93 ha of industrial land, 6,000 m² of available existing buildings and a separate 29.6699 ha filtration-field area outside the park that residents can use.
No. Plot configuration is determined by the production layout, logistics, sanitary zone and utility requirements of each project.
Land lease, lease of existing buildings, a joint venture or a dedicated investment partnership.
Up to 1.3 MW is available under current technical conditions. According to the initiator, the existing substation is rated at 2.9 MW and provisional additional connection potential is up to 9 MW. This additional capacity is neither reserved nor guaranteed; final capacity, scheme, timing and cost require project-specific technical conditions.
In Brailiv, Zhmerinka district, Vinnytsia region, with an on-site railway spur and access to the M21 / E583 transport corridor.
Complete the potential resident questionnaire. The team will screen the technical requirements and prepare an initial site and cooperation configuration.
Potential resident questionnaire
It takes about 7 minutes. If some parameters are not known yet, provide indicative values.
Direct contact
Contact Vitaliy or Oleksandr. For a faster review, send the questionnaire or a short description of your production, space and utility requirements.